DPD and Seattle Public Utilities (SPU) are hosting a public meeting on June 10, 2015 about the 2016 Stormwater Code and Manual Update. The meeting is from 4:00 – 6:00 p.m. in Seattle Municipal Tower, room 4080. The draft documents of the 2016 Stormwater Code and other project applicability code changes are available for your review on our website.

You can provide comments by attending our public meeting on June 10, 2015.  You can also provide written comments on the draft 2016 Stormwater Code update by sending them to StormwaterCode@Seattle.gov or by mailing to the address below:

Sherell Ehlers
Seattle Public Utilities
700 Fifth Ave, Suite 4900
PO Box 34018
Seattle, WA  98124-4018

Our official public comment period on the draft 2016 Stormwater Code ends on June 30, 2015. We will continue to take comments until we send final recommendations to the Mayor for transmittal to the City Council. Email correspondence is preferred.

If you’re suggesting a code change, include as much of the following information as you can:

  • Number and title of the code section (for example:  22.805.070.D.a)
  • Specific code language you’re suggesting
  • Explanation of why the code should be changed

We may not be able to respond to individual comments, but we will take all comments into consideration.

There will also be opportunities this summer to provide public comment on the draft 2016 Stormwater Manual.  A public meeting related to the 2016 Stormwater Manual will be held in late summer or early fall of 2015.