The Seattle Department of Transportation will pave north side of South Lander Street between Third Avenue South and Occidental Avenue South on Aug. 7 and 8 if weather permits, working from 7 a.m. to 7 p.m..
One lane in each direction will remain open. All sidewalks and crosswalks will remain open.
A traffic flagger from the BNSF Railway will be on site to assist with vehicular and pedestrian traffic in the event a train arrives at South Lander Street.